Publicación:
INTEGRATED DESIGN OF BUILDING PROJECTS: FROM BIM TO ADDITIVE MANUFACTURING

dc.creatorERIC FABIÁN FORCAEL DURÁN
dc.creatorJAIME OLIVIER SOTO MUÑOZ
dc.creatorRODRIGO HERNÁN GARCÍA ALVARADO
dc.date2022
dc.date.accessioned2025-01-10T15:29:18Z
dc.date.available2025-01-10T15:29:18Z
dc.date.issued2022
dc.description.abstractTHIS CHAPTER EXPLORES KEY ASPECTS OF INTEGRATED PROJECT DESIGN USING THE EXTREME COLLABORATION METHODOLOGY, WHICH ENABLES THE CONSTRUCTION OF BIM MODELS THAT INTEGRATE ARCHITECTURE, STRUCTURES, AND MEP, USING A ?WAR ROOM? OR ?INFORMATION ROOM? (I-ROOM) WHERE VARIOUS PROJECT SPECIALISTS INTERACT IN REAL TIME. TO ACHIEVE THE HIGHEST DEGREE OF INTEGRATION WITHIN A PROJECT, THE BIM MODEL IS THEN SENT TO A ROBOTIC ARM THAT THROUGH ADDITIVE MANUFACTURING TECHNIQUES, PRINTS CONCRETE ELEMENTS PREVIOUSLY DESIGNED IN THE I-ROOM?IN SHORT, TOTAL MACHINE?MACHINE INTEGRATION (BIM-ROBOT).
dc.formatapplication/pdf
dc.identifier.doi10.1007/978-981-19-1894-0
dc.identifier.urihttps://repositorio.ubiobio.cl/handle/123456789/12251
dc.languagespa
dc.publisherNEW TECHNOLOGIES IN BUILDING AND CONSTRUCTION
dc.relation.uri10.1007/978-981-19-1894-0
dc.rightsPUBLICADA
dc.titleINTEGRATED DESIGN OF BUILDING PROJECTS: FROM BIM TO ADDITIVE MANUFACTURING
dc.typeCAPÍTULO DE LIBRO
dspace.entity.typePublication
ubb.EstadoPUBLICADA
ubb.Otra ReparticionDEPARTAMENTO DE INGENIERIA CIVIL Y AMBIENTAL
ubb.Otra ReparticionDEPARTAMENTO DE CIENCIAS DE LA CONSTRUCCION
ubb.SedeCONCEPCIÓN
ubb.SedeCONCEPCIÓN
ubb.SedeCONCEPCIÓN
Archivos