A PROBABILISTIC-BASED METHOD TO DETERMINE OPTIMUM SIZE OF PROJECT BUFFER IN CONSTRUCTION SCHEDULES

dc.creatorERIC FABIÁN FORCAEL DURÁN
dc.date2016
dc.date.accessioned2025-01-10T14:30:03Z
dc.date.available2025-01-10T14:30:03Z
dc.date.issued2016
dc.description.abstractBUFFERS ARE USED TO DEAL WITH THE DETRIMENTAL IMPACTS OF UNCERTAINTY ON PROJECTS. HOWEVER, METHODS FOR THE ALLOCATION OF BUFFERS OFTEN PROVIDE SINGLE UNIQUE SOLUTIONS, WHICH ARE INEFFICIENT IN THE MULTIOBJECTIVE DECISION-MAKING ENVIRONMENT OF CONSTRUCTION. THIS PAPER DISCUSSES A PROBABILISTIC-BASED BUFFER ALLOCATION METHOD (PBAL), WHICH ENABLES THE FINAL DECISION ON BUFFER SIZE TO BE MADE BY THE PROJECT PLANNERS BASED ON THEIR PREFERENCES ABOUT PROJECT COMPLETION TIME. IT INVESTIGATES THE CONSTRUCTION PROJECTS WHERE EACH ACTIVITY STARTS AS EARLY AS POSSIBLE. ACCORDINGLY, THE DECISION INVOLVES DETERMINING THE SIZE OF TIME BUFFER AT THE END OF THE PROJECT NETWORK. THE ACCURACY OF THE RESULTS IS SUBJECTED TO APPROXIMATION AND NUMERICAL ERRORS IN THE MATHEMATICAL MODELS AMONG OTHERS. MOST BUFFER ALLOCATION HEURISTICS FOR PROJECTS HAVE APPROXIMATION ERRORS AND SIMULATION-BASED TECHNIQUES INTRODUCE NUMERICAL ERRORS BY THEIR ITERATIVE SAMPLING CALCULATION APPROACH. PBAL CAN MINIMIZE THESE ERRORS BY SUPPORTING IMPORTANT DETAILS OF MODELING THE PRODUCTION IN ACTIVITIES, AND PRESERVING THESE DETAILS WHEN MODELING AT THE PROJECT LEVEL. THE PBAL CAPABILITY TO MINIMIZE MATHEMATICAL MODELING ERRORS AND ITS ACCURACY HAS BEEN SUCCESSFULLY TESTED USING THE RECORDS FROM TEN CONSTRUCTION PROJECTS.
dc.formatapplication/pdf
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0001158
dc.identifier.issn1943-7862
dc.identifier.issn0733-9364
dc.identifier.urihttps://repositorio.ubiobio.cl/handle/123456789/7704
dc.languagespa
dc.publisherJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
dc.relation.uri10.1061/(ASCE)CO.1943-7862.0001158
dc.rightsPUBLICADA
dc.titleA PROBABILISTIC-BASED METHOD TO DETERMINE OPTIMUM SIZE OF PROJECT BUFFER IN CONSTRUCTION SCHEDULES
dc.title.alternativeUN MÉTODO BASADO EN LA PROBABILÍSTICA PARA DETERMINAR EL TAMAÑO ÓPTIMO DEL BÚFER DEL PROYECTO EN LOS CRONOGRAMAS DE CONSTRUCCIÓN
dc.typeARTÍCULO
dspace.entity.typePublication
ubb.EstadoPUBLICADA
ubb.Otra ReparticionDEPARTAMENTO DE INGENIERIA CIVIL Y AMBIENTAL
ubb.SedeCONCEPCIÓN
Archivos